Lumpkin Solar

Client: IEA Renewable Energy, Inc
Location: Stewart County, Georgia
Duration: 2020
Service Provided: MTC provided construction materials engineering and testing services throughout the site. Our team performed visual observation during earthwork activities, including site fill, cable trench backfill, and road construction. We conducted lab testing for maximum density, moisture content, and Atterberg limits. Pile load tests were documented in coordination with IEA, and weld inspections were performed for inverter skid assemblies and structural steel elements.
Project Description: Located in Stewart County, Georgia, the Lumpkin Solar Project supports the region’s growing demand for renewable energy. The development included installation of PV racking systems, inverter skids, and access roads to support energy collection and distribution across the site.